The undertaking called „Reconstruction with extension and change of usage method of the warehouse and sport-recreational part for the needs of the logistic centre and facilities of technical infrastructure, roads and internal squares” covered in the Ist stage activities of deputy investment and supervision in the scope of the following works:
The works presented above were connected with a simultaneous connection of gas, sanitary sewage system and rain system; construction and assembly of transformer station as well as reconstruction of low and medium voltage power engineering lines.
Technical parameters:
Utility area: 14 633,84 m2
Development area: 14 893,13 m2
Cubature: 157 686,39 m3
Height: 11,95 m
Number of storeys: 1, social-office part 2
Investor: TAIMA Investments Sp. z o.o.
Location: ul. Toruńska 151, Bydgoszcz
Scope of works: Managing the project
Duration of the realization: August 2012 - January 2014